Date
|
Description
|
Monday
25th November 2013
|
We
will film the first and third shot on the first storyboard sheet, as these
are in the same location. We
will then film the second and fifth shot on the first storyboard as these are
both in the same location and can be filmed quicker.
|
Tuesday
26th November 2013
|
The
fourth shot of the character sitting on the bench will be filmed; this would
mean that the First storyboard would be complete. The first shot of the
Second storyboard sheet would then be filmed as it is in the same location as
the shot mentioned before.
|
Wednesday
27th November 2013
|
The
second, fourth and fifth shot of the second storyboard sheet would then be
filmed as these shots are all in the same location. The third shot of second
storyboard sheet will then be filmed.
|
Thursday
28th November 2013
|
The
First and second shot of the third storyboard sheet will then be filmed as
they are in the same place, and its easier to do these shots together. Then
the third and fourth shot of the third storyboard sheet will be filmed as
they are in the same location as each other.
|
Friday 29th November 2013
|
The
fifth shot of the third storyboard sheet will then be filmed, meaning that
the third storyboard sheet will be complete. Next the first three shots of
the fourth storyboard will be filmed as they are in the same location and it
is easier to film. Next the fourth and fifth shots of the third storyboard
sheet would then be filmed, meaning that the fourth storyboard sheet would
then be completed.
|
Monday
1st December 2013
|
The
first and third shots of the fifth storyboard sheet would then be filmed as
they are in the same place, saving us time. Then the second shot of the fifth
sheet would be filmed.
|
Tuesday
2nd December 2013
|
The
last two shots of the fifth storyboard sheet would then be filmed as they are
in the same location as each other, this means that the fifth storyboard
sheet would then be finished.
|
Wednesday
3rd December 2013
|
The
first and third of the sixth sheet would then be filmed as they are in the
same location as each other. After that the second, fourth and fifth would
then be filmed as they are in the same location, making it easier for us to
film and saving us time. This means that the 6th sheet would then
be complete.
|
Thursday
4th December 2013
|
The
three shots of the seventh sheet would be filmed in their location, meaning
that all of the filming would then be completed, and only editing left to do,
before our rough cut would then be complete
|
Tuesday, 19 November 2013
Shooting Schedule
Monday, 18 November 2013
Risk Assessment
The images shown below are the 6 pages of our risk assessment, this risk assessment shows that we have taken into account the risks that come with our filming, such as falling crew or equipment. Also it shows that we know what these risks are, for example we know that the crew and/or equipment could fall, so we have taken precautions to stop the crew and/or equipment from falling, such as making sure they are safe and away from the ledge, or when they are close to the edge making sure that there is no possible way that they could fall, like being harnessed into what ever they are hanging off.
Monday, 11 November 2013
Storyboard
This is the storyboard, this shows all of the shots that are going to be in our final video. It also tells you the timings and transitions throughout all of the shots.